Material description:
Steel structure as below:
Finished project:
FAQ
1.You are manufacture factory or trading company?
A: We are manufacture factory. Welcomed to visit our factory in the city of Weifang.
2.Why Choosing prefab house?
There are many advantages to modular camp construction for site camps including:
(1) Easy to assemble and disassemble for several times without damage.
(2) Could be lifted, moved , and combined freely.
(3) Heatproof and waterproof.
(4) Cost saving and convenient transportation (Each 4 container house can loaded in one standard container)
3. Why we trust you?
(1) We have already passed the ISO,CE,SGS,BV certification.
(2) We are one of the suppliers for Chinese government key project.
(2) We are one main container house supplier for UN project. We could provide the project pictures and videos for your reference..
4.How could I install the container house?
There are two ways to solve the problem.
(1) We could provide the full services for the whole installation, included sending our engineers to your country to help the installation.
(2) If you do not need the construction supervision, we could provide the full services include the installation video, detailed drawings, and guide the installation through network step by step.
Company Informatio
Weifang Henglida Steel Structure Co.,Ltd.( Lida Group) is one of the largest manufacturers of the prefabricated house, container house, steel villas, and steel structure warehouse in China.
We have specialized in this field for more than 20 years, and we have exported our products to more than 90 countries as well as our domestic market with ISO9001, CE,BV and SGS certification.
Lida Group is the main supplier of the series products for the Chinese key projects, such as Qingdao bay bridge ,Qingdao Channel Tunnel, etc.
No. |
Part name |
Material name |
Description |
|
1 |
ground channel |
C shape steel |
C80x40x15x2.0 |
|
2 |
column |
Double C shape steel |
2C80x40x15x2.0 welded |
|
3 |
Beam for second floor |
Steel frame |
2C80x40x15x2.0 L40x4 welded |
|
4 |
Sub-beam for second floor |
C shape steel |
C80x40x15x2.0 |
|
5 |
Purlin for roof |
Corner steel |
L40x4 |
|
6 |
Bracing for roof |
Corner steel |
L40x4 |
|
7 |
Bracing for aisle and rain shelter |
C shape steel |
C80x40x15x2.0 welded |
|
8 |
Bracing between the columns |
Round steel bolt |
φ8 |
|
9 |
Step board |
Steel board |
t=3.0mm |
|
10 |
stair |
Steel stairs |
|
|
11 |
Wall panel |
V950 EPS sandwich panel |
50mm thickness steel plate:0.3mm |
|
12 |
Patition panel |
V950 EPS sandwich pannel |
50mm thickness, steel plate:0.3mm |
|
|
13 |
Roof panel |
V950 EPS sandwich pannel |
50mm thickness,steel plate: 0.3mm |
|
14 |
Floor for second storey |
plywood |
16mm thickness |
|
15 |
Rain shelter |
One layer color steel plate |
0.45mm thickness |
|
16 |
windows |
PVC sliding windows |
0.93mx1.715m |
|
17 |
door |
Sandwich panel door |
0.85mx2.1m |
|
18 |
intensive and common bolt |
|
Different dimension |
|
|